Use one contractor project calculator, organize the first bid package, and bring Treasure State Concrete, Inc. the information needed for a useful project conversation.

Treasure State Concrete, Inc. civil construction equipment at work

Pre-bid intake

Start with one complete package.

A clear scope and current documents help everyone identify gaps before bid day. Send what is available and label unknowns instead of burying them in assumptions.

Introduce the project to Treasure State Concrete, Inc. →
  • Scope and bid form

    Identify bid items, alternates, allowances, exclusions, unit-price requests, and the exact work you want priced.

  • Plans, specifications and addenda

    Send the current drawing set, project manual, geotechnical information, revisions, and every issued addendum.

  • Quantities and takeoff basis

    Include your takeoff, plan dimensions, material types, thicknesses, waste assumptions, and who owns final quantity verification.

  • Site access and logistics

    Show haul routes, truck turnarounds, staging and stockpile areas, overhead and underground conflicts, soft ground, traffic control, and work-hour limits.

  • Schedule and placement plan

    Provide bid date, anticipated start, phases, pour sequence, daily production targets, crew plan, and milestone or completion requirements.

  • Quality control and acceptance

    Clarify testing, sampling, inspection, density or strength requirements, rejected-material responsibility, and the party authorized to accept the work.

  • Submittals and approvals

    List required mix designs, product data, samples, color selections, certificates, shop drawings, traffic plans, and approval lead times.

Interactive project planning

One calculator for quantities and logistics.

Build linked material takeoffs, test load and hauling pace, and estimate a user-defined reinforcement grid. It does not calculate prices or a bid total. Everything runs only in this browser; Treasure State Concrete, Inc. does not receive or save the values you enter.

Need a simple homeowner or product calculator instead? →

One connected planning workspace

Contractor project calculator

Build material takeoffs, test production and haul assumptions, and estimate a user-defined rebar grid in one project-planning workspace. Nothing is saved, uploaded, or sent. This calculator does not calculate bid prices or a bid total. Planning only.

Project identity and scope

Project setup

Browser only

Linked material quantities

Quantity takeoff

Use plan dimensions

Estimate concrete, aggregate/base, asphalt, or trench/backfill quantities. Add each result to one project quantity list. Dimensions, density, allowances, and conversion factors remain your assumptions. No prices or bid totals are calculated.

ft
ft
in
each
%
Planning concreteyd³ with entered allowance
Plan-volume quantityyd³ before allowance
Material quantities in this project plan0 lines

No material quantities added yet. Run a takeoff above and add the result to the project plan.

Plan dimensions do not account for every field condition, irregular shape, over-excavation, settlement, yield, compaction, waste, rejected material, or specification requirement. Confirm the takeoff and the assumptions shown in the contract documents before bidding.

Production and logistics

Load and placement pace

Confirm with dispatch

Load and placement pace

Estimate concrete loads, placement duration, and an average load cadence from your entered plan.

yd³
yd³/load
yd³/hr
Loadsrounded up
Durationhours
Cadenceminutes/load

Hauling and cycle plan

Use dispatch-confirmed payload and a realistic round-trip cycle to estimate loads and fleet time.

tons or yd³
same unit/load
trucks
min
hr/day
Loadsrounded up
Elapsed timehours at entered cycle
Working daysat entered day length

Load sizes, legal payload, plant output, truck availability, route time, traffic, weather, testing, access, unloading, pump setup, crew pace, and delays can change the result. This is not a delivery schedule or dispatch commitment.

User-defined layout only

Reinforcement planning

No design assumptions

Estimate a simple two-way rectangular rebar grid using only the approved dimensions, spacing, cover, stock length, and waste allowance you enter.

ft
ft
in o.c.
in
ft/piece
%
Grid before wastelinear feet
With entered wastelinear feet
Stock pieces lengthwise · crosswise

This does not select bar size, spacing, cover, laps, splices, development, hooks, dowels, chairs, supports, or reinforcement design. It does not lay out cuts. Use approved plans and a qualified design professional.

Quantity and logistics planning—not bid pricing.

This calculator does not produce any pricing, costing, profit, or a final bid. It is not engineering, an engineered takeoff, reinforcement or mix design, a quote, order, dispatch commitment, contract review, or tax, legal, accounting, insurance, or safety advice. Approved plans, specifications, addenda, field verification, testing, and project conditions control.

Paving crew placing and finishing asphalt

Coordinate the whole operation

Production, trucking, access, and crew pace belong in the same plan.

Quantities are only part of a bid. Confirm the scope, source, sequence, haul cycle, site constraints, testing responsibilities, and acceptance path before committing resources or a price.

Important limitation

Planning support—not a final bid.

This contractor help center provides general planning estimates only. It is not engineering, reinforcement or mix design, project pricing, a quote, an order, a dispatch or delivery commitment, or tax, legal, insurance, safety, or accounting advice. It does not replace the project plans, specifications, addenda, field verification, testing requirements, professional design, contract review, or a complete bid review. Confirm quantities, products, availability, responsibilities, schedule, access, pricing, and all project requirements before bidding, purchasing, or building. The project calculator does not calculate bid prices or a bid total.